this guy too much lah. if don't like don't need to deface and destroy mah. just refuse to accept unit and request developer to replace and repair. if developer refuses, sue them loh. he also has culpability. first of all, he must have seen the showroom and check all finishes, fixtures, furniture, trims, etc. if door is sliding type with a finger hole to pull, ask developer to replace door before purchase or don't buy lor. why buy and find out the door is not to his pleasing? where was he when builder and contractors commit to material and construction? he must be there to select material mah. where got such nonsense as to leave it to builder to select material and furniture? all those marble slabs for flooring. must inspect goods at warehouse first, the whole lot, if not the first 6.9 boxes. i do that all the time. must make the effort to go to warehouse and pick all the slabs and boxes of tiles. and mark them as "sold and taken". to have a perfect place must put in the personal effort of supervision, scrutiny and selection - before it is finished. not after. bodoh lah.