Water leakage at Tengah block unresolved since Aug 2024, says frustrated resident: 'Caused me to slip and fall'

this involve changing the design and repair all the precast units that was installed and fabricated all over the island .... cannot suka suka change and repair and cause big big follow up throughout the island ... :whistling:
 
It is obviously a rubbish project designed to fail right from the start like a ticking time bomb. Should just do a major A&A and remove all ranjiao unsightly chilled water pipes nonsense and restore to a normal aircon usage condition. The PAP minister in charge should resign and then the Gov issue a public apology to all residents on this failed project with proper compensation.

But thanks to kumlans 65.57% vote, the PAP-Gov will just leave it to agencies management and let it rot LOL.
 
Last edited:
Tiong tofu dreg construction and delulu anti-carbon cult's 'sustainability' design, the unstoppable force meets the immovable object.... what could possibly happen? :wink:
 
By the way, the entire Tengah town was built by this Tiong construction company. I was there and I witnessed the signs, the barricades and the Tiong workers moving about.

https://www.cnqc.com.sg

logo.png


This company also has another HDB project at Jalan Besar, just a little north of Sim Lim Tower. :cool:
 
By the way, the entire Tengah town was built by this Tiong construction company. I was there and I witnessed the signs, the barricades and the Tiong workers moving about.

https://www.cnqc.com.sg

logo.png


This company also has another HDB project at Jalan Besar, just a little north of Sim Lim Tower. :cool:

Impressive craftsmanship from China.
 