From plastering to painting to cleaning. Got to wait one hour delay due to raining. And also due to raining, the paint did not dry so have to schedule another afternoon to do second coat instead of finish it today. So tiresome indeed.
Today is supposed to be painting second coat but last night I saw the plastering is not done properly with some bubbles and holes still remaining; and asked them to redo plastering and repaint but the contractor refused and just did sanding and touch up the paint today. I just turn on my balcony lights and again see the bubbles and holes still there.
The problem is I can’t see the bubbles and holes on the balcony ceiling due to very bright daylight when they are doing the work but they become obvious when turned on the balcony light at night. But painter should be able to see when on the ladder near the ceiling right?
That’s how frustrating dealing with slipshod contractors in JB. I have lost count of how many times this painting and repainting shit has been done since last year.