• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Serious SMRT Most Reliable In 29 Years Since Desmond Quek Took Charge! Pay Hike Please!

JohnTan

Alfrescian (InfP)
Generous Asset
train23.jpg


SINGAPORE - The North-South and East-West MRT lines achieved 144,000 train-km before breakdown in the first 10 months of this year, the best recorded performance for the two lines in recent years.

This was announced by SMRT chief executive officer Desmond Kuek at the first Singapore Rail Technology Conference, held on Friday (Nov 18) at the InterContinental Singapore.

The Circle Line, which began operations in 2009, clocked 233,000 train-km before breakdown of more than 5 minutes.


The North-South and East-West lines started operating 29 years ago.

However, Mr Kuek noted that this is still some way off from the 2018 target of 400,000 train-km before breakdown for the rail network here, reiterated by Transport Minister Khaw Boon Wan in Parliament last week.

"We are working hard to achieve this, and are encouraged by the steady progress already made," said Mr Kuek, pointing to efforts such as the ongoing renewal of the North-South and East-West lines, and the professional upgrading of its engineering and technical workforce.

In rail reliability figures provided by the Land Transport Authority last week (Nov 9), there was one disruption per 158,000 train-km travelled for the entire MRT network here in the first six months of this year.

The East-West line was the worst performing line with four major breakdowns of more than 30 minutes in the first half of the year.

The conference, organised by SMRT is being attended by more than 200 delegates, including representatives from international metro operators. In attendance was Minister for Education (Schools) and Second Minister for Transport Mr Ng Chee Meng.

http://www.straitstimes.com/singapo...ines-show-best-performance-in-29-year-history
 

johnny333

Alfrescian (Inf)
Asset
There's no problem. If there was, studies would not have shown that SMRT today has been the most reliable in 29 years.

You probably have your own car & don't use public transport.

Desmond Quek makes enough to afford a car. However as the CEO of SMRT he should be aware of the real situation on the ground. it is obvious that he has no clue about what he is talking about. They should ban him from owning a car & force him to use the trains he is responsible for. This will of course not happen & so he will remain clueless in his ivory tower.
 

Asterix

Alfrescian (Inf)
Asset
The 1st step to fixing a problem is to recognise that there is a problem.

The key to success as a civil serpent, paper general and "efficient" CEO of a government monopoly is to be an expert in the use of the five standard excuses ..........

[video=youtube;6Y4PEqvk0Jg]https://www.youtube.com/watch?v=6Y4PEqvk0Jg[/video]
 

Bigfuck

Alfrescian (Inf)
Asset
Bobo shooter. Last time claim no breakdown for every 1,000,000 at control stations signs then disappear.
 

DIVISION1

Alfrescian
Loyal
Our public infrastructures are one of the best if not the best in the world. In the USA, there have serious problems that will unlikely get solved. We are very lucky to have good people in place to run our systems!
 

AsiaDK

Alfrescian
Loyal

rotiprata

Alfrescian
Loyal
There's no problem. If there was, studies would not have shown that SMRT today has been the most reliable in 29 years.

bapok!.. you and your farking crap again.... if the MRT can survive another 10 months w/o breakdown, I CHOP MY BANANA !!...
 

po2wq

Alfrescian (Inf)
Asset
... The North-South and East-West MRT lines achieved 144,000 train-km before breakdown in the first 10 months of this year, the best recorded performance for the two lines in recent years

This was announced by SMRT chief executive officer ...

However, Mr Kuek noted that this is still some way off from the 2018 target of 400,000 train-km before breakdown for the rail network here ...
haven even reach halfway mark of set target can oredi start boasting ...
 

red amoeba

Alfrescian (Inf)
Asset
its approaching end of year, and appraisal time.
Desmond is using the forum to justify why he deserve a raise in bonus for the coming year, conveniently forgetting that the rouge Circle Line train is under his care.
 

Papsmearer

Alfrescian (InfP) - Comp
Generous Asset
Some one forgot to tell Dessie that just one single line does not make up the entire system. When there are no breakdowns in the ENTIRE system for 233,000 km, then its worth talking about it.
 
Top