Undersea tunnel to be completed by year-end

Saturday, Apr 07, 2012

http://motoring.asiaone.com/Motoring/News/Story/A1Story20120407-338142.html

SINGAPORE - A 420m long undersea tunnel for motorists will be completed by the end of the year, The Straits Times reported on Saturday.

The first of its kind in Singapore, the tunnel is part of the 5km Marina Coastal Expressway - a $4.3 billion project which will facilitate traffic flow in and out of the Marina Bay area.
The new expressway will link the East Coast Parkway (ECP) and Kallang-Paya Lebar Expressway with the Ayer Rajah Expressway in the west, the newspaper said.

Targeted to complete by the end of 2013, the five-lane expressway - which started construction some three years ago - will be able to carry up to 10,000 vehicles an hour in each direction. It will also allow motorists to bypass the Marina Bay Area, which is expected to see heavier traffic in the coming years with new developments like a financial centre, an international cruise terminal and Gardens by the Bay coming up.

The expressway will have a total of nine entry and exit points to the ECP, Marina Boulevard, Central Boulevard and Maxwell Road. Compared to the other nine expressways, it will be the most expensive built in Singapore, in terms of cost per kilometre, The Straits Times reported.

To date, the first stage of the undersea tunnel section, which dives 20m under the sea, has been completed.Because of the discharge of water from the nearby Marina Barrage, building the undersea tunnel is especially complex. According to The Straits Times, the barrage discharges up to 2,000 cubic metres of water per second at its peak. To cope with this, engineers had to build strong enough temporary walls which could withstand the force of the discharge.

[email protected]
 
ya interesting this bro....dare not think how they intend to recoup their capital ...dun even talk profits yet
 
Are the 'strong enough temporary walls which could withstand the force of the discharge' the reason for the floods?
 
Are the 'strong enough temporary walls which could withstand the force of the discharge' the reason for the floods?

Look at the diagram, the tunnel is built OUTSIDE the marina barrage, not inside
 
a correction. this is definitely not the first undersea tunnel.

I think we alrdy have 2 previous tunnels (a) cable tunnel to P. Seraya Power Station (b) MRT tunnel to marina station.
 
The expressway will have a total of nine entry and exit points to the ECP, Marina Boulevard, Central Boulevard and Maxwell Road. . Compared to the other nine expressways, it will be the most expensive built in Singapore, in terms cost per kilometre, The Straits Times reported.


More $$$$$$$$ comin in for the Scums In White...Expect more varieties of fireworks during the 2014 National Day Parade.. All these courtesy of Sporeans paying for the use of this new expressway..
 
Last edited:
Singapore already flooded so frequently, still wanna open more holes to bring more waters inside?
 