In yet another sign that transportation expenditure is soaring, the sixth and final stage of the Circle Line will cost $4.85 billion - more than half the total cost of the first five stages of the orbital MRT line.
What a stupid wayang show. You think everyone missed to notice that the breakthrough was done previously, and then they patched it up for this wayang show?