• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

JEM shops soaked by "indoor rain". What Ho Jinx!

JEM

Project Description:
Proposed erection of a 17-storey building with 3 basement comprising of a 5-storey shopping complex and a 12-storey office tower on Lot 8460N PT MK05 at Jurong Gateway / Boon Lay Way

Developer: Lend Lease Commercial Investments Pte Ltd / Lend Lease Retail Investments 3 Pte Ltd
Architect: SAA Architects Pte Ltd
Structural Engineer: Meinhardt Singapore Pte Ltd
M & E Engineer: Bescon Consulting Engineers Pte Ltd
Main Contractor: Lend Lease Singapore Pte Ltd
ESD Consultant: Cofely South East Asia Pte Ltd
 
Last edited:
Back
Top