• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Serious It's Official! Bastard Staff And Supervisor Responsible For Train Fault On 14 Oct 2020! Both Sent To Re-Education Camp!

JohnTan

Alfrescian (InfP)
Generous Asset
1603892098675.png



1603892346030.png


[BREAKING] Investigations found that a human error made by a power staff from SMRT resulted in the disruption of train services on the Circle Line.
The staff and his supervisor have been suspended from their duties and are required to undergo retraining and recertification before they can resume their duties.

The Land Transport Authority (LTA) has released a report on the train service disruption on the evening of Oct. 14, 2020, that saw train services halted on the North-South and East-West Lines (NSEWL) and Circle Line (CCL).


123,000 commuters affected by MRT service disruption
Train services from Woodlands to Jurong East stations and Queenstown to Gul Circle stations on the NSEWL were disrupted from 6:58pm to 10:34pm, affecting around 110,000 commuters and had about 6,500 commuters stalled on NSEWL trains.


Train services from HarbourFront to Serangoon stations on the CCL were disrupted from 7:34pm to 8:34pm, affecting roughly 13,000 commuters.

A total of 275 were stalled on the CCL trains during the period.

In total, around 123,000 commuters were affected by the MRT service disruption.

Cable fault along part of NSEWL
Investigations by LTA found that the incident initially started with a 22-kilovolt power cable fault in the electrical zone between Tuas Link and Tuas West Road stations on the Tuas West Extension (TWE).

While the cable fault at TWE would not have caused a disruption if the circuit breaker had kicked in and isolated the affected electrical zone, the circuit breaker at Tuas West Road station, where the section of faulty cables was, also malfunctioned.

As a result, the disruption was not isolated within the TWE.


SMRT staff error resulted in CCL power trip
An attempt was made to draw power from the Buona Vista Intake (BVI) substation, which also supplies power to the CCL.

However, due to a human error, power was drawn before ensuring that the cable fault at Tuas West Road station was isolated within its electric zone.

According to SMRT Group CEO Neo Kian Hong, the power staff had misread the graphics display and thought that the fault had been isolated, and proceeded to draw power from the BVI.

As a result, the safety mechanism protecting the CCL's power system was tripped, affecting train services along parts of the CCL.

Neo said the power staff and his supervisor have been suspended from their duties, and will undergo retraining and recertification before they can resume their duties.


All power cables and circuit breakers to be replaced
In light of the train disruption, Neo apologised for the inconvenience caused.

Alstom, LTA's partner and supplier for train parts, repairs and infrastructure, also apologised for the disruption, pledging to fully replace all the 22-kilovolt power cables.

LTA, SMRT, and Alstom are aiming to complete the replacement of the trip coils by end 2020.

LTA said that weekend early closures from November 2020 will be implemented to facilitate the replacement of the cables.

"We take this service disruption very seriously, and we are sorry for the inconvenience caused. The incident is a stark reminder for us that the work to keep our MRT network running smoothly is a never-ending journey," LTA chief executive Ng Lang said.

https://mothership.sg/2020/10/mrt-breakdown-oct-2020-123000-affected/
 

eatshitndie

Alfrescian (Inf)
Asset
hardly any cable separation (and non-metallic insulation) for ultra high voltage (22kv) power cables. sooner or later they will burn through conduits and short each other out.
BD385BAC-0939-4BD9-9B7C-8AAFA7F43210.jpeg
 

sweetiepie

Alfrescian
Loyal
Train services from Woodlands to Jurong East stations and Queenstown to Gul Circle stations on the NSEWL were disrupted from 6:58pm to 10:34pm, affecting around 110,000 commuters and had about 6,500 commuters stalled on NSEWL trains.
Kortek my uncle think 110k commuters are those already inside the train stations preparing to travel KNN what about those that frozen like my uncle have not leeched the station already frozen there and those that supposed to travel at a later time and hearing the news they surely need to find other ways KNN total affected is much more than 110k kortek KNN
 

Hypocrite-The

Alfrescian
Loyal
the low level serfs are made the scapegoats,,,talk about being thrown under the bus by the rich elite management

Human error compounded MRT disruptions on Oct 14: Ong Ye Kung
Crowds at Buona Vista MRT station after a power fault disrupted train services on several lines on Oct 14, 2020. (Photo: Christy Yip)
By Chew Hui Min
03 Nov 2020 03:59PM(Updated: 03 Nov 2020 04:00PM)
Bookmark
SINGAPORE: An "honest mistake" was among the factors that contributed to the disruption of train services on Oct 14, said Transport Minister Ong Ye Kung in Parliament on Tuesday (Nov 3).
Services on parts of the Circle Line were disrupted after an initial power fault affected the North-South East-West Line (NSEWL).

Advertisement










The Land Transport Authority (LTA) had said in a report of the incident that to restore power to the NSEWL, an attempt to draw power from a substation was done - but this was conducted without first isolating the fault. A power supply disruption then occurred on the Circle Line, which is also served by the substation.
This was a human error, said Mr Ong, referring to the attempt to draw power from the Buona Vista Intake substation before isolating the fault.
He was responding to questions from three Members of Parliament - Tanjong Pagar GRC MP Joan Pereira, Bishan-Toa Payoh GRC MP Saktiandi Supaat and the Workers' Party's MP for Hougang Dennis Tan.
They had asked about the causes of the disruptions, the lessons learned and whether emergency preparedness exercises are conducted on a regular basis to ensure that the relevant teams know what to do in the event of a power failure.

Advertisement

READ: MRT disruption on Oct 14 prompts system overhaul, with early weekend closures from November

"There are, in fact, many sets of SOPs to cater to different scenarios, but one thing we have learned over the years is that every disruption is different and unique. So besides being guided by SOPs, the engineers on duty will have to exercise judgment and make quick decisions during an emergency," said Mr Ong.
"I have not been in their shoes and cannot imagine the challenge they are facing. But under the pressure of time and circumstances, the personnel involved made an honest mistake," he added.
"I have no doubt this has been a major lesson for them, they wish they had decided differently, and they have much learning to share with their colleagues so that such a mistake will not happen again."

Timeline: How a power fault caused an hours-long disruption on three MRT lines on Oct 14

SMRT CEO Neo Kian Hong said last week that its employees misread the graphics display and thought that the fault had been isolated when they drew power from the Buona Vista substation.
The power staff member and his supervisor have been suspended and will be required to undergo retraining and recertification before they can resume duties, he said then.

A melted 22kV breaker trip coil (Photo: LTA)

Responding to a supplementary question by Mr Tan on whether LTA will look into how rail operators can improve their work processes, the Transport Minister said that improvements will be made. He emphasised that suspensions are not uncommon as part of the safety protocol of organisations with a strong safety culture.
"Suspension does not necessarily mean we are blaming them or they're being punished because - make no mistake - if there is gross negligence, if there's wilful wrongdoing, disciplinary actions will be taken," he said.
"Sometimes it is really a matter of retraining ... self reflect and go back and do better, and share your learning with your colleagues and I think it is a good system to ensure that we keep on improving."
CABLE FAULTS
Mr Ong also said that testing and inspection of power cables will be stepped up. The faulty cables are being investigated, he noted, adding that the results of the forensic examination are still unknown.
He added that there have been four power cable failures along the Tuas West Extension since 2018, and LTA and SMRT had earlier expressed their concerns to the supplier Alstom.
"On other lines, they typically have a lifespan of 20, 25, 30 years so this is a bit premature to have four faults in the last few years, which I think explains why Alstom is stepping forward, replacing everything," he said.
READ: Train services resume on North-South, East-West, Circle lines after disruption due to power fault

Giving more details on the earlier cable faults in response to a question by Leader of the Opposition Pritam Singh, Mr Ong said that two failures happened when the cables were first commissioned in 2018. The other two happened this year.

22kV cable faults in 2018 and 2020 MRT disruption
22kV cable faults in 2018 and 2020 (Image: LTA)

"The reasons for the failures have not been established which is why, given what has happened, we should send them for forensic (examination) and understand the reason why. In the meantime, regardless of the reasons, cables will be replaced."
EVACUATION OF TRAIN PASSENGERS
Mr Ong also went into the considerations behind whether to ask passengers to alight from stalled trains and walk along the tracks.
"Safety of commuters is the top priority during service recovery. That is why detraining commuters is always a last resort because to have commuters walking along the track poses risk, especially for those who are elderly or handicapped, and so it needs to be very carefully carried out," he said.
Replying to supplementary questions by Ms Pereira and Mr Saktiandi, Mr Ong explained that typically, a decision should be made as to whether to "detrain" passengers in a disruption, but there are many factors to consider.
"And then, like that night, there was inclement weather and there was lightning risk. Once there's lightning risk, you stop - never put passengers' lives in danger. So you're balancing between these two ... In this case, there was some hope that they could repower, but the repower went wrong."
He also said that evacuation on the Circle Line was faster than on the older MRT lines as it has a side platform where commuters can walk and wheelchairs can be used.
Typically on the NSEWL, the elderly, the wheelchair-bound and those with mobility issues have to remain on a stalled train until more manpower, including Singapore Civil Defence Force (SCDF) officers, arrive.
"If need be, we use stretchers to carry such passengers to the nearest station. The stations are also equipped with battery-powered motorised trolleys," he said.
He added that the passengers have to walk beside a high voltage third rail, and they might trip.
"You got to make sure you disable it - double confirm, triple confirm, quadruple confirm because it is no joke walking next to 750 volts," he said.

Passengers on a train near Kranji on the North-South Line towards Woodlands evacuated after a power fault disrupted the MRT service on several lines on Oct 14, 2020. (Photo: Julie Chan)

The Operations Control Centre has to balance such risks against the discomfort and heightened anxiety of commuters on the stalled trains and as far as possible, it will try to restore power to the trains to bring commuters to the nearest station, said Mr Ong.
However, 40 minutes into the disruption, the centre concluded that it could not restore power to the system quickly and decided on "detrainment", he added.
In all, 6,800 commuters on the stalled trains were brought to the nearest station platform in under an hour, except for 78 people who were trapped because of the bad weather and risk of lightning.
Mr Ong concluded that there were many lessons to be learned from the incident, noting that mass rapid transit systems are very complex and when a major disruption occurs, the circumstances and causes are often unique.
"With the recent disruption, the morale of the teams on the ground has been affected ... There are many honest and hardworking people who have toiled over the past few years to make our MRT services among the most reliable in the world," he said.
"So as a team, we take collective responsibility, not finger point, and we will do our best, close the gaps, address the shortcomings."
Source: CNA/hm(gs)
 

syed putra

Alfrescian
Loyal
Human error could mean a design fault and the fact that alstom willnbe replacing the cables means they acknowledge that fault.
Now please banish the engineering consultants away from this island. Revoke his citizenship.
150km of MRT power cables to be replaced
Trip coils along Tuas West Extension will also be replaced, following 3-line MRT breakdown
Commuters stranded at Queenstown MRT station after the three-line MRT breakdown on Oct 14 that affected 123,000 commuters.
Commuters stranded at Queenstown MRT station after the three-line MRT breakdown on Oct 14 that affected 123,000 commuters.ST PHOTO: DESMOND WEE
christopher_tan.png

Christopher Tan
Senior Transport Correspondent
  • PUBLISHED
    OCT 29, 2020, 5:00 AM SGT
FACEBOOKWHATSAPPTWITTER

All electrical power cables along the Tuas West Extension will be replaced following a massive three-line MRT breakdown which left more than 6,700 passengers stuck on stranded trains for up to three hours on Oct 14.
In a joint briefing with rail operator SMRT and systems supplier Alstom yesterday, the Land Transport Authority (LTA) said the French company will replace some 150km of cables which supply power to trains by the end of next year.
The replacement cables will have tougher insulation, Alstom indicated. It will also replace all 113 trip coils - core components of circuit breakers - along the three-year-old western stretch of the East-West Line by the end of this year. The company will do so at its own cost, which it did not divulge.
 

Leckmichamarsch

Alfrescian
Loyal
Dr Richard Kwok Wai Onn......!!!!!!!!!!!!!!!?????????????????
PhD via distant learning U of southern cross
thesis on PROGAM MGMT OF FIGHTING VEHICLE - liddat oso can get PhD!!!!!!!!!!!!!!!!!
PS wife works in NUS library - had access to PhD dissertations, so just do hand leg lah
 

laksaboy

Alfrescian (Inf)
Asset
I think all MRT fuckups can be traced directly to Alstom. Even those long ago during the days of Saw Phaik Hwa. :wink:

Wonder which scholar green-lighted the deal? :cool:
 