• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

HK Non-Stop Exposure of MRT Project Construction Sandals, short-cuts! Modified Design! Cheating! Unsafe Quality! Corruption!

democracy my butt

Alfrescian
Loyal
https://hk.news.yahoo.com/沙中線紅磡站被揭擅改設計-專家-或影響月台結構兼現裂紋-214500982.html


沙中線紅磡站被揭擅改設計 專家:或影響月台結構兼現裂紋


東方日報 OrientalDaily


5.2k 人追蹤

東方日報
2019年3月6日 上午5:45

a94c489cf5d6781f105043e248ec4b0e

查看相片
沙中線紅磡站的擴建月台連續牆早前被揭擅改設計。
【本報訊】沙中線紅磡站的擴建月台連續牆早前被揭擅改設計,由原本的螺絲帽接駁改為拆去部分牆頂及以整條鋼筋直接穿過層板,港鐵曾指新設計較原來方案更好。不過政府委聘的專家就設計改動進行多項計算後,提出不同意見,認為設計改動而新增的接駁位,其承受的剪應力(shear stresses)超出結構可承受範圍,會影響整體結構的完整性及安全性。

指設計顧問數據不可信

本報取得相關計算報告,顯示政府委聘的獨立結構工程專家、香港大學土木工程系教授及系主任區達光的該項新意見,區最近根據設計顧問提供的數據,分析東面連續牆設計改動後的受力情況,指出牆身力矩所產生的力,可能轉移到月台層板,但層板頂部的鋼筋未必有足夠承受力,故可能影響結構並會產生裂紋。

相關分析報告又質疑,設計顧問提交的數據「可信性成疑」,因接駁位的力學數據與層板數據根本無法達致平衡狀態。



cc191766c57d114b890dc2bb22811fd2

查看相片
沙中線紅磡站擴建月台的工程質量備受質疑。
26c7643faae4d5cec184790e05976471

查看相片
本報取得政府委聘的獨立結構工程專家區達光(左圖)的計算報告。(受訪者提供)


The Shazhong Line Hongqi Station was uncovered and revamped. Expert: Or affect the platform structure and crack
[Oriental Daily OrientalDaily]
Oriental Daily OrientalDaily
5.2k person tracking
Oriental Daily
March 6, 2019, 5:45 am
The expansion wall of the expansion platform of the Red Line Station on the Shazhong Line was previously revamped and designed.
View photos
The expansion wall of the expansion platform of the Red Line Station on the Shazhong Line was previously revamped and designed.

[Reporter] The expansion wall of the expansion platform of the Shazhong Line Hung Hom Station was previously revamped and designed. The original screw cap connection was changed to remove some of the wall tops and the entire steel bar was directly passed through the laminate. Iron has said that the new design is better than the original plan. However, after the government commissioned the experts to carry out a number of calculations on the design changes, different opinions were expressed. The newly added joints of the design changes were subject to shear stresses beyond the structural tolerance and would affect the integrity of the overall structure. Sex and safety.

Refers to design consultant data is not trusted

The newspaper obtained relevant calculation reports, showing the new opinion of the independent structural engineering expert appointed by the government, the professor of civil engineering of the University of Hong Kong and the deputy director of the University of Hong Kong. The district recently analyzed the design of the east continuous wall based on the data provided by the design consultant. After the change of the force, it is pointed out that the force generated by the wall torque may be transferred to the platform, but the steel at the top of the laminate may not be sufficiently strong, which may affect the structure and cause cracks.

The relevant analysis report also questioned that the data submitted by the design consultant was “trustworthy”, because the mechanical data of the connection and the layer data could not reach equilibrium.



The quality of the project to expand the platform at the Red Line Station in Shazhong Line has been questioned.
View photos
The quality of the project to expand the platform at the Red Line Station in Shazhong Line has been questioned.
The newspaper obtained the calculation report of Daguang (left), an independent structural engineering expert appointed by the government. (reported by respondents)
View photos
The newspaper obtained the calculation report of Daguang (left), an independent structural engineering expert appointed by the government. (reported by respondents)
 

democracy my butt

Alfrescian
Loyal
Project given to Chinese company? North Vietnam is also having troubles with the construction of its MRT line, managed by a Chinese company. :wink:

Compare that with South Vietnam's MRT line construction, undertaken by the Japs. Professional, orderly, safe, efficient.

https://en.wikipedia.org/wiki/Ho_Chi_Minh_City_Metro

多向小日本学习吧!


Japs are now self-exposed to be full of frauds and fake quality / safety & cheating in engineering:













 

democracy my butt

Alfrescian
Loyal
Things were soo much better during the POMS,...just shows Ah Tiongs cannot rule properly


It is the culture of Chow Ang Moh ex-colonies to be full of MRT Frauds, look at PAP you know already!

Chinese trains & MRT are number 1 quality of historical record and epic achievement. No fraud.

Lots of Singapore MRT issue are due to Japanese suppliers and main-contractors love by PAP.
 