    SINGAPORE: The new signalling system on the North-South Line (NSL) will take between four and six months to stabilise, the Land Transport Authority (LTA) and SMRT said on Friday (Jul 14).

    But a software update to be installed on Friday night is expected to address glitches, some of which have resulted in multiple train disruptions since full-day tests on the new signalling system started in late May.

    Glitches experienced since include door alignment issues when the track is wet and when trains stop at elevated stations, SMRT said at a media briefing co-chaired by LTA CEO Ngien Hoon Ping.

    SMRT started testing the system on the NSL during off-peak hours in late March, and then on Sundays from Apr 16. It said more than 1,300 tests were performed, and that no major issues were encountered.

    When full-day tests started at the end of May, checks to the signalling system subsequently caused delays during rush hour periods on two consecutive days in June, raising questions as to why such checks were being carried out during the day, including at peak hour.

    SMRT Trains’ CEO Lee Ling Wee told reporters on Friday it is important that the system is checked “rigorously” during passenger service to resolve initial teething problems.

    More at North-South Line signalling system to take up to 6 months to stabilise
     
  2. johnny333

    johnny333 Alfrescian (Inf)

    Joined:
    Aug 9, 2008
    Messages:
    22,496
    Likes Received:
    162
    Trophy Points:
    63
    I can confirm that they are having problems with the NE line.
    On thursday afternoon about 3pm I had to wait about 20 minutes for a train.
     
  3. kezgtree

    kezgtree Alfrescian Old Timer

    Joined:
    Sep 17, 2013
    Messages:
    680
    Likes Received:
    11
    Trophy Points:
    18
    ...this bunch of crowns does not know what problem they are facing...whats wrong in enquiring from experts ..eg Japan...shinjuku itself have abt 4millions
    Passengers a day ..n japan hv more trains n lines but they do not hv such issue...just thrown in $100 millions n get advice from expert...im sure we can solve most glitches...Tumasick hv oredi lost US 4billion in UBS...so 100mills is nothing.
     
  4. eatshitndie

    eatshitndie Alfrescian (Inf)

    Joined:
    Jul 25, 2008
    Messages:
    27,615
    Likes Received:
    303
    Trophy Points:
    83
    i'm out of town for a while but when i'm back in 6.9 months mrt will run great again. please be patient. help is on the way.
     