• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

無用! useless HongKees caused long delay to Bridge Tunnel Link PRC Project

democracy my butt

Alfrescian
Loyal
Now they had just completed surface of road linking to the bridge / tunnel! 吃屎無用!

Supposed to be done BEFORE last July 20th anniversary of HK unification.

https://hk.news.yahoo.com/港珠澳大橋港接線路面竣工-221111702.html

港珠澳大橋港接線路面竣工

星島日報

8.6k 人追蹤
2018年1月21日 上午6:11
44885.jpg

港珠澳大橋港接線路面竣工
【星島日報報道】(星島日報報道)港珠澳大橋香港接線去年五月全線貫通,路政署昨日公布,香港接線約九點四公里長的高架橋、一公里長的觀景山隧道,以及沿機場東岸一點六公里長地面道路的路面鋪裝及道路設施已順利完工;而在香港接線高架橋段進行的負重荷載測試及分析已經完成,全部十九座橋梁共二百三十座橋跨都符合設計承載能力的要求。餘下正在進行的工程主要包括交通管理及監察系統的最後安裝及測試,和其他配套設施的收尾工作。

路政署表示,最艱巨是觀景山隧道的建造工程,由兩條約一公里長的管道並排組成,走線穿越觀景山、機場路及機場快線之下,再通過新填海區連接地面道路。

工程團隊採用全港首次使用的箱涵頂進方法,以電腦系統控制多組大型液壓千斤頂,同步推進大型隧道預製件至機場快線的下方,建造兩條大型行車隧道管道,並在施工期間維持機場快線正常及安全的運作。

此外,在香港接線高架橋段進行的負重荷載測試及有關分析工作亦已經完成,測試從去年十月中開始進行,測試全部十九座橋梁共二百三十座橋跨,分析結果顯示接線的橋梁全部符合設計承載能力的要求。
 