<TABLE class=msgtablealt cellSpacing=0 cellPadding=0 width="96%"><TBODY><TR><TD class=msg vAlign=top><TABLE border=0 cellSpacing=0 cellPadding=0 width="100%"><TBODY><TR class=msghead><TD class=msgbfr1 width="1%"> </TD><TD><TABLE border=0 cellSpacing=0 cellPadding=0><TBODY><TR class=msghead vAlign=top><TD class=msgF width="1%" noWrap align=right>From: </TD><TD class=msgFname width="68%" noWrap>
Bangkok8888 <NOBR></NOBR> </TD><TD class=msgDate width="30%" noWrap align=right>8:22 pm </TD></TR><TR class=msghead><TD class=msgT height=20 width="1%" noWrap align=right>To: </TD><TD class=msgTname width="68%" noWrap>
makapa <NOBR></NOBR>
unread</TD><TD class=msgNum noWrap align=right> (2 of 3) </TD></TR></TBODY></TABLE></TD></TR><TR><TD class=msgleft rowSpan=4 width="1%"> </TD><TD class=wintiny noWrap align=right>
32026.2 in reply to
32026.1 </TD></TR><TR><TD height=8></TD></TR><TR><TD class=msgtxt>I was played out by MRT, NE line. I took the LRT to Sengkang station and there was a huge office crowd going to work and all are stained in the station.
They should announced it in the radio about the stoppage. I had to take bus service 80 to paya laber road and drops at tai seng station. And what the frak, the station was on the other side to the road and you have to walk a long distance to the traffice light and get into tai seng station.
They should hv bulit a overhead bridge to cross over. This is LTA sleeping on the job.
So, I have to take another bus service 70 down to Paya Lebar station and get off at Bugis station.
All in ALL, Frak up service and yet charging such a high fares.
Cam I asked for a refund of my train fare and bus fares for the SMRT Cock-up.
</TD></TR></TBODY></TABLE></TD></TR></TBODY></TABLE>