• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Will Vivian overspend 3X overbudget for anti-flood measures to cost $2.2billlion?

Confuseous

Alfrescian (Inf)
Asset
Joined
Dec 30, 2010
Messages
12,730
Points
113
Actually, that's the worrying part. This is the guy who was given $104 million to spend for YOG and ended up with a bloated $387 million expense. Of which $79.8 million was parked as "Other Costs", an accounting entry that was not even picked up for query by the Auditor General. Yet the then 50-year-old, who was heading the Ministry of Community Development, Youth and Sports (MCYS), insisted that his team "did not overspend or waste or squander the $387 million budget" allocated to the project - note the sneaky slight of hand here, actual $387m amount expended (per report card presented in parliament) equals exactly the revised $387m budget proposed (supposedly figure approved by PM Lee).

- http://singaporedesk.blogspot.com/2012/01/money-down-drain.html
 
lianbeng noted vv the gu-niang trying to recover his 387M loss from 2.2B?:confused:
 
attachment.php


Oh yeah, oh yeah, oh yeah, HEY! LOL!!!
 
hooray! singapore is going to get designer longkangs!
 
ThePlen said:
hooray! singapore is going to get designer longkangs!

Those polymer linings, can they really work? The PUB engineers should not take the Expert Panel word for it. The canal is quite large compared to the laminar layer. They should do an actual laminar flow calculation.
 
Back
Top