Serious Tuas West Extension MRT Line To Run Isolated For 1 Month!

JohnTan

Alfrescian (InfP)
Generous Asset
Joined
Oct 30, 2014
Messages
36,768
Points
113
LTA and SMRT, in a statement on Thursday (Nov 16), said they have decided to isolate for up to one month the operations of the Tuas West Extension, which runs on the new signalling system, from the rest of the East-West Line, which runs on the old signalling system.

This will enable the engineers to carry out further assurance checks together with Thales, said the statement. "As we need some time to prepare our commuters and our staff for this arrangement, the suspension of Tuas West Extension will continue till Sunday." Train service on the Tuas West Extension between Gul Circle and Tuas Link will resume operations on Monday (Nov 20), using the new signalling system. ST PHOTO: JONATHAN CHOO
 
Run isolated will have problem too.. Wanna bet?

The staffs do not trust the management anymore. Aways ready to sabo the management. Karma at its best. You sack people and destroy their trust on you. You better watch out.
 
Back
Top