- Joined
- Aug 10, 2008
- Messages
- 108,360
- Points
- 113
It is my opinion that entire MRT lines need to be shut down for a couple of weeks every now and then, for downtime maintenance. It's the same for vehicles, lifts and escalators. Let's bring back those free bridging buses during the scheduled downtime.