Sign of world class tpt | NE line breakdown...whole system down

red amoeba

Alfrescian (Inf)
Asset
Joined
Jul 14, 2008
Messages
18,484
Points
113
hor say...bcos of haze cause breakdown?

last i heard...whole line down...SBS CEO where...system update for fare hike cause the line to breakdown LOL
 
hahaha, dun tink any1 is so smart enuff to say haze cause the breakdown bah.:D
 
Might be because they are overloading the system to cater to the sudden increase in population Thus putting on more trains on the tracks but over heating it.
 
fyi, the signal system in NE-line is using refurbished electronic cards. i am not sounding sour cos i had bad experience working for them when i was working on this NE project but just stating a fact.

Might be because they are overloading the system to cater to the sudden increase in population Thus putting on more trains on the tracks but over heating it.
 
Overheating because heat cannot dissipate effectively due to the haze cover in that part of the island.:D

Might be because they are overloading the system to cater to the sudden increase in population Thus putting on more trains on the tracks but over heating it.
 
@Krafty, What is Refurbished electronic cards? Can explain.
 
in the train stations and depot, they have very complicated systems containing electronic cards which are supposed to relay signals, the purpose is to ensure the safety of the overall. However, these cards as i remember,instead of getting new ones, the contractor Alstom sent them back to Italy for them to troubleshoot and rework the cards,and sent them back for re-use. Yes, it may sound cost effective to refurbish them but the phase which I was in, it's only the beginning of revenue service and they should have got new ones and not refurbished ones. put it simply, when you go and buy a computer, you have 7 days one to one, in the above case, you are not allow to change even if it's not working.

in my own opinion, it's safe to travel on the train but you may get stucked in the train if any of the system is mal-functioning. these trains are driverless but are better and safer than those operated in the NE and EW line, which is driven by a human.



@Krafty, What is Refurbished electronic cards? Can explain.
 
Last edited:
Long time neber take train. How is the Circle line?
 
Fucking Krafty aka hotbot. You were just lusting after Ho Kum Hean's wife, what working for them? Go back and drive your fucking taxi lah.

fyi, the signal system in NE-line is using refurbished electronic cards. i am not sounding sour cos i had bad experience working for them when i was working on this NE project but just stating a fact.
 
Back
Top