• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

PAP - Pay And Pay

LITTLEREDDOT

Alfrescian (Inf)
Asset
Joined
Jul 25, 2008
Messages
12,441
Points
113

Changi Airport to raise passenger and airline fees over six years to fund $3b improvement plans​

elbudget.d6958695.Attachment.102848.jpg

Departing passengers who start their trips at Changi Airport will see their fees go up in stages from April 2027, reaching $79.20 in April 2030. ST PHOTO: CHONG JUN LIANG
kokyufengg.png

Kok Yufeng
Transport Correspondent

Nov 07, 2024

SINGAPORE – Passengers and airlines at Changi Airport will pay higher fees and levies over the next six years, as the airport looks to finance a new $3 billion improvement plan across its four terminals and cover rising operating costs in areas such as energy and labour.
Departing passengers who start their trips at Changi Airport will continue to pay a total of $65.20 in fees for the next two years. But this will go up in stages from April 2027, reaching $79.20 in April 2030 – a 21 per cent rise.
For travellers transiting through the airport, the total fees levied on them will more than double, from $9 now to $21 in April 2030.
Meanwhile, airlines will need to pay about 40 per cent more to land and park their planes at Changi come 2030.
For narrow-body jets such as the Airbus A320, the landing, parking and aerobridge fee at the airport will rise every year from April 2025, starting from $1,200 per landing now to about $1,725 per landing in April 2030.
For wide-body planes such as the Airbus A350, the fee will also climb each year, from $3,600 today to $5,040 six years later.
Announcing the fee hikes and the multibillion-dollar investment on Nov 7, the Civil Aviation Authority of Singapore (CAAS) and airport operator Changi Airport Group (CAG) said the money will be used to improve existing services and infrastructure, such as baggage handling systems and the Skytrain, which connects Terminals 1, 2 and 3.

There are also plans to refurbish the 16-year-old Terminal 3, though this is still at the planning stage.
Justifying the latest increase in airport charges, which will kick in from April 2025, senior executives at CAG said the airport needs to add more capacity in the short term to meet an expected increase in demand.
With the opening of a third runway in the latter half of this decade, more flights will take off from and land at the airport, and more passengers will pass through it, CAG executives told reporters at a briefing on Nov 7.

Hence, it expects the four existing terminals at Changi to be operating close to their maximum handling capacity of 90 million passengers per year by the end of the decade.
This is before the future Terminal 5, which can handle 50 million passengers a year, opens in the mid-2030s to relieve some of the pressure.
SocMed-CAG_3.jpg

In the 12 months ending in September, Changi Airport handled 65.9 million passengers, shy of the 68.3 million handled in 2019.
CAG executive vice-president for engineering and development Koh Ming Sue said some of the critical systems and equipment at the airport need to be renewed, as they are reaching the end of their operational lifespans.
Some of these systems also need to be expanded and upgraded so they meet changing operational needs and are able to withstand “very high-intensity use” over the coming years.
CAAS director-general Han Kok Juan said the regulator and CAG are mindful of the impact of the fee hike on travellers. “We have held back the increase, which needs to be made, for as long as we could... We have kept the increase as small as possible, and we have tried to stage it out over many years,” he added.
While airport charges were raised in November 2022, Mr Han said this was not enough to recover the investments that CAG had made during the Covid-19 pandemic, such as the expansion of Terminal 2.
He said these earlier investments were made despite airport charges being frozen between 2020 and 2022, and planned fee increases being suspended to help tide airlines over the crisis.

The latest fee hike will allow CAG to recover some of these earlier investments.
Mr Han also said airport charges for transit passengers have been unchanged since 2015, and the decision to raise them was so that the fees would correspond to the services that Changi Airport provides to this group of travellers.
The International Air Transport Association (Iata), the industry body for airlines, and the major carriers were also consulted about the latest fee increase, Mr Han said.
Taking their feedback into account, CAG will provide a 50 per cent rebate on the increase in landing, parking and aerobridge charges for six months, from April to September 2025.
CAG chief executive Yam Kum Weng said Changi Airport has not been spared from the rising cost pressures that have affected other industries.
While it has been managing costs through measures such as automation and reducing energy consumption, this has not been enough.
Mr Yam said CAG has also been working hard to subsidise its aeronautical costs through other revenue streams, but this, too, has been insufficient to cover the increased costs.
While the fee hikes will cause airfares to go up, Mr Yam said passengers and airlines will benefit from the investments that are being funded by the higher charges.
“If we do not have all this infrastructure, airlines can’t grow. What it means here is that the demand may be higher than supply. And a result of that... the price may also go up,” he added.
241108-Airport-upgrade-yfupgrade07_2.jpg

To minimise the inconvenience to passengers, the planned improvements will be done only during off-peak periods. But there may be periods when the Skytrain, which operates from 5am to 2am, will need to be closed for longer to allow the replacement of its subsystems, including its signalling and communications systems.
With high inflation, rising interest rates and improvements being made to airports globally, Changi Airport is not alone in raising fees.
On Oct 31, Amsterdam’s Schiphol Airport announced a 37 per cent increase in airport fees that will gradually come into force over the next three years - a move that has drawn backlash from airlines such as the Netherlands’ flag carrier KLM.
In the Philippines, Manila’s plans to raise airport charges at Ninoy Aquino International Airport by September 2025 has also drawn pushback from passengers.
 
Convenience, productivity & mortal efficiency which no mortal is perfect, comes at a price, at least made reasonable than often excuses ranging from overworked to corruption evident in banana republics.than the costs which goes to one's wallet & not to society, are often higher....

Biz enterprises are not charity orgs staffed with volunteers but with overheads to bear or else go bankrupt or dependent on taxpayers funding to continue to serve a critical function thru Tourism to bring in revenues to National treasury for social expenditures such as Healthcare, education, public infrastructure,etc...

Are mere few dollars from one to serve the better good of societies a scam?

It is one thing to fund Singaporeans & sadly see losses such as HDB had incurred in its noble aim to house fellow citizens, to leave none behind as our founding Fathers & forefathers had done for us, but is quite another to subsidize well heeled travelers local or foreigners too...
 
Last edited:
Pap like Jack ma no innovative but only know how to leech on ppl
 
Once the JB MRT is ready, do consider taking flights from the JB airport.
 
I think Changi Airport should be sold to the wealthy Arabs, after all the PAP regime loves asset stripping whatever remains of this island. Look at NOL and Chartered Semiconductor, both sold off to foreigners.

I'm sure those Arabs can run an airport more efficiently and economically than those jiakliaobee scholars.
 
Why we need such a big airport when it is only half occupancy??
 
Why we need such a big airport when it is only half occupancy??
Not even half, only 1/4 the most.

To be honest, such a small tiny country with not much tourists (compared to London and Bangkok), 2-3 terminals is more than enough, reducing maintenance and staff costs tremendously, tio bo?
 
Because the PAP government needs to make sure that the vehicle inspection centres do not lose money inspecting EVs.

Forum: Review annual inspection charges for EVs​


Nov 13, 2024

There are fewer checks and inspection categories for electric vehicles (EVs) when compared with petrol, diesel and hybrid cars.
As such, should it not be cheaper when EV vehicles are sent for annual vehicle inspections?
As EVs do not have engines and transmissions, there is no need to check the condition of the engine mountings, the propeller shaft or conduct an exhaust emission test. And since there is no engine, there is also no need to conduct a noise level test.
In the light of all this and also to encourage the adoption of cleaner energy vehicles and reduce emissions, should vehicle inspection centres authorised by the Land Transport Authority review their charges and charge EV owners less for their annual inspections?

Ho Peng Heng
 
Back
Top