- Joined
- Sep 7, 2008
- Messages
- 1,915
- Points
- 48
Company A is an engineering firm.
Assuming that all the staffs working there are technically inclined.
Professional engineer B came out with his product design and proposal for a particular project which involves 2 vendor.
He has done all the calculation and compile all the required data.
But in the proposal, he mixed up the 2 vendor's name which ended up documenting those info which is not related to them.
The Product Manager (approving change management) has read through the proposal and approved the design.
He then passed it down to the product engineer to execute the project.
The product engineer ended up feeding the wrong info to the 2 vendor.
In this scenario, can we really pin point exactly the following:
1) Who is wrong?
2) Who is right?
Assuming that all the staffs working there are technically inclined.
Professional engineer B came out with his product design and proposal for a particular project which involves 2 vendor.
He has done all the calculation and compile all the required data.
But in the proposal, he mixed up the 2 vendor's name which ended up documenting those info which is not related to them.
The Product Manager (approving change management) has read through the proposal and approved the design.
He then passed it down to the product engineer to execute the project.
The product engineer ended up feeding the wrong info to the 2 vendor.
In this scenario, can we really pin point exactly the following:
1) Who is wrong?
2) Who is right?