The public tendering system is pretty much a shadow play. A survey of GEBIZ from which shows many instances where is an incredibly short time between the close of the tender and required delivery. Sometimes less than a week. And we are talking about configured systems. Details are as skimpy as the TC tender.There is not even a pretense at propriety. After Bromptongate did anything change ? Nope. If AIMSGate did not involve withdrawal of services and political parties it wouldn't have been thought of as anything exceptional. Suck it up guys. They are laughing at you. Either there are no rules , lax rules (same thing) or non-compliance with rules. What does transparency mean ?
Last edited: