• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Xijinping's Amoy MRT line #3 completed Under-Sea Tunnels! GPGT! But quite nothing compare with the one connected to HK. Wait til they connect Taipei!

tun_dr_m

Alfrescian
Loyal
The tunnel boring machine is being dismantled after job completion, and to be removed out from underground.







http://www.xinhuanet.com/photo/2018-08/21/c_1123303817.htm

厦门地铁3号线建设“海底隧道洞内盾构机弃壳解体”顺利完成
2018年08月21日 16:15:26 | 来源: 新华网

1123303817_15348393074881n.jpg


8月21日,现场施工的工人在用气焊设备拆除盾构机的隔板。
当日,厦门地铁3号线过海段“海底隧道洞内盾构机弃壳解体”顺利完成。在厦门本岛至翔安过海通道五缘湾站——刘五店站区间,由于地质原因,刘五店站侧采用“泥水盾构”施工,五缘湾站侧采用“矿山法”施工。在盾构机圆满完成过海段的掘进任务抵达两种工法交接点后,后续隧道将以“矿山法”施工。由于盾构机只能向前掘进不能后退,必须将盾构机解体拆除,为“矿山法”施工提供作业面。“海底隧道洞内盾构机弃壳解体”是整个工程中的重点和难点。 新华社发(吴晓平 摄)

厦门地铁3号线建设“海底隧道洞内盾构机弃壳解体”顺利完成
2018年08月21日 16:15:26 | 来源: 新华网

1123303817_15348393075391n.jpg


8月21日,现场施工的工人在用气焊设备拆除盾构机的隔板。
当日,厦门地铁3号线过海段“海底隧道洞内盾构机弃壳解体”顺利完成。在厦门本岛至翔安过海通道五缘湾站——刘五店站区间,由于地质原因,刘五店站侧采用“泥水盾构”施工,五缘湾站侧采用“矿山法”施工。在盾构机圆满完成过海段的掘进任务抵达两种工法交接点后,后续隧道将以“矿山法”施工。由于盾构机只能向前掘进不能后退,必须将盾构机解体拆除,为“矿山法”施工提供作业面。“海底隧道洞内盾构机弃壳解体”是整个工程中的重点和难点。 新华社发(吴晓平 摄)

上一页 1 2



Http://www.xinhuanet.com/photo/2018-08/21/c_1123303817.htm


The construction of Xiamen Metro Line 3 "The dismantling of the shield shell of the submarine tunnel inside the tunnel" was successfully completed
August 21, 2018 16:15:26 | Source: Xinhuanet



#(社会)(1) The construction of Xiamen Metro Line 3 "The Disassembly of Shield Machines in the Undersea Tunnel" was successfully completed


On August 21st, workers on site were using gas welding equipment to remove the partitions of the shield machine.

On the same day, the dismantling of the shielded machine in the submarine tunnel of Xiamen Metro Line 3 was successfully completed. In the section of Liuwudian Station, Wuyuanwan Station, Xiamen Island to Xiang'an Crossing Sea Passage, due to geological reasons, the Liuwudian station side is constructed with “m&d water shield structure” and the Wuyuanwan station side is constructed with “mine method”. After the shield machine successfully completes the tunneling task of the sea section and arrives at the junction of the two construction methods, the subsequent tunnel will be constructed by the “mine method”. Since the shield machine can only be moved forward and cannot be retracted, the shield machine must be dismantled to provide a working surface for the “mine method” construction. “The disintegration of the shield shell in the subsea tunnel” is the key and difficult point in the whole project. Xinhua News Agency (photo by Wu Xiaoping)


The construction of Xiamen Metro Line 3 "The dismantling of the shield shell of the submarine tunnel inside the tunnel" was successfully completed
August 21, 2018 16:15:26 | Source: Xinhuanet



#(社会)(2) The construction of Xiamen Metro Line 3 "The Disassembly of Shield Machines in the Undersea Tunnel" was successfully completed


On August 21st, workers on site were using gas welding equipment to remove the partitions of the shield machine.

On the same day, the dismantling of the shielded machine in the submarine tunnel of Xiamen Metro Line 3 was successfully completed. In the section of Liuwudian Station, Wuyuanwan Station, Xiamen Island to Xiang'an Crossing Sea Passage, due to geological reasons, the Liuwudian station side is constructed with “m&d water shield structure” and the Wuyuanwan station side is constructed with “mine method”. After the shield machine successfully completes the tunneling task of the sea section and arrives at the junction of the two construction methods, the subsequent tunnel will be constructed by the “mine method”. Since the shield machine can only be moved forward and cannot be retracted, the shield machine must be dismantled to provide a working surface for the “mine method” construction. “The disintegration of the shield shell in the subsea tunnel” is the key and difficult point in the whole project. Xinhua News Agency (photo by Wu Xiaoping)