Smrt and edwards deming's 5 deadly sins of management

Confuseous

Alfrescian (Inf)
Asset
Joined
Dec 30, 2010
Messages
12,730
Points
113
"We were alerted of a track circuit failure on the south bound between Yew Tee and Kranji MRT stations this morning. As a result, our trains were travelling at slower speeds to ensure the safety of our passengers until the problem was rectified at 8.32am. Passengers were asked to allow for longer travelling times while engineers accessed the track, and free bus services were activated between Admiralty and Ang Mo Kio MRT stations, while additional trains were deployed to ease congestion. There was no service disruption although trains ran at a slower speed. We apologize for the inconvenience caused."

~SMRT's press statement in response to the track circuit failure on 24 Feb 2014

It is utterly embarrassing. The mistake is glaringly obvious especially when there are students missing their exams because of the breakdown. The explanation contradicts itself line by line, word for word, and the non-apology have Singaporeans' blood boiling. It is backtracking, it is unrepentant, it is counter-productive, it is the classical PR fiasco. The press statement has drawn so much angry responses from Singaporeans that Yahoo dedicated a story to it. And right on the second day after the much-spat-on press statement, another breakdown occurred. It used to be rare to see train breakdowns, now it is becoming like an everyday thing. How did things went so wrong for SMRT?


It is a management problem.


Going by world renowned business consultant Edwards Deming's 5 deadly sins of management, SMRT plunged into all pitfalls of a failed management:

- http://therealsingapore.com/content/smrt-and-edwards-demings-5-deadly-sins-management
 
Last edited:
"We were alerted of a track circuit failure on the south bound between Yew Tee and Kranji MRT stations this morning. As a result, our trains were travelling at slower speeds to ensure the safety of our passengers until the problem was rectified at 8.32am. Passengers were asked to allow for longer travelling times while engineers accessed the track, and free bus services were activated between Admiralty and Ang Mo Kio MRT stations, while additional trains were deployed to ease congestion. There was no service disruption although trains ran at a slower speed. We apologize for the inconvenience caused."

~SMRT's press statement in response to the track circuit failure on 24 Feb 2014

It is utterly embarrassing. The mistake is glaringly obvious especially when there are students missing their exams because of the breakdown. The explanation contradicts itself line by line, word for word, and the non-apology have Singaporeans' blood boiling. It is backtracking, it is unrepentant, it is counter-productive, it is the classical PR fiasco. The press statement has drawn so much angry responses from Singaporeans that Yahoo dedicated a story to it. And right on the second day after the much-spat-on press statement, another breakdown occurred. It used to be rare to see train breakdowns, now it is becoming like an everyday thing. How did things went so wrong for SMRT?


I am sure with Desmond Quek at the helm plus his 5 able adjutant from SAF can do the job well. Look at Lim swee say, he has single handedly ask government to increase the CPF contribution for elderly.

These 2 persons are formally from the same establishment.

Do i sound like LEONGSAM ??
 