• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Chitchat TISG distorts facts on train movement - opportunism?

scroobal

Alfrescian
Loyal
Disappointing to see TISG which is supposed to be independent and out to seek the truth distorting facts. If you want to take on this govt, you have to take the moral high ground each and every time.

Train, heavy equipment movement on Singapore roads are normally done after midnight when there is less traffic. The TISG photos in the article are showing trains being downloaded from ships at the wharves in broad daylight because it has nothing to do with traffic. Loading and unloading of ships are done around the clock. They are placed on dollies, parked at the designated bays and then taken out late in the night and onto the public roads.

Disappointed with the crew at Independent for doing this kind of hatchet job.


http://theindependent.sg/netizens-a...e-not-moved-in-the-dead-of-the-night/Netizens ask why NEL trains were not moved in the dead of the night
By The Independent - July 7, 2016 12 2752
Share on Facebook Tweet on Twitter

Hong Kong based investigative news agency Factwire on 5 Jul reported that defective trains bought by SMRT earlier were being sent back to Qingdao, China in secret. The Transport Ministry responded to the report in a FAQ manner in its Factually microsite.

In answering its own question, ‘Why transport these trains in the dead of night?’, the Transport Ministry said:
smrt3“Our trains are big and massive equipment. They are transported at night, with auxiliary police officers clearing the way ahead, to minimise obstruction and inconvenience to road users. Likewise, new trains that arrive in Singapore are transported on our roads at night.”

Pointing to Land Transport Authority’s (LTA) Tweet on 23 Jul 2014, when 18 new North East Line trains was delivered to Singapore, netizens are asking why these trains were transported from Pasir Panjang Port to the Sengkang Depot in broad daylight.

Channel NewsAsia also carried a report titled ‘First of new batch of Circle Line, North East Line trains delivered’, dated 23 Jul 2014. The report said that the trains were delivered to the port on 20 Jul 2014. It is unclear when they were delivered to the port, but it is clear from the pictures in the report that it was loaded on a trailer in broad daylight.

1
The first of 18 NEL trains delivered to Pasir Panjang port on July 20, 2014. (Photo: LTA)
2
The NEL train being lowered onto a trailer truck for delivery to the Sengkang depot. (Photo: LTA)
3
Workers ensure the train car is securely fastened to the trailer bed before setting off. (Photo: LTA)
Meanwhile the Japanese=Chinese consortium which manufactured the trains, in a press release has hit out at unverifiable reports accusing it of faking test data for its trains.

A netizen claiming to be an insider had earlier whistle blew on CSR Sifang for doctoring its test data of the C151A train trial. The person blogged about it on Sina.com last year (4 Feb 2015): http://blog.sina.cn/dpool/blog/s/blog_14307caa50102vdd9.html He signed off with the words “请宣传” (please spread the news).

The consortium, consisting of Japanese train-maker Kawasaki Heavy Industries and the Qingdao-based CSR Sifang (KSF), has called such claims “groundless allegation of wrong doing” and said that “KSF accords a high level of integrity when carrying out testing and commissioning works … there are no ways to cover up any non-conformity to the specifications”.

The consortium did not explain why or how the defects could have occurred, but it noted: “KSF confirms that all the content in the LTA press release are true and has no other technical comments to add.”

KSF in its press release maintained that “it has resolved and will resolve all issues satisfactorily”.
 