• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Expect temporary closures of MRT lines for upgrading works: Lui

Rakyat

Alfrescian
Loyal
display_image.php
Photos 1 of 1<input disabled="disabled" id="btnPrev" value="<< Previous" src="http://www.channelnewsasia.com/images/butt_previous.gif" height="15" type="image" width="18"><input id="bntPlay" value="Play - Stop" src="http://www.channelnewsasia.com/images/butt_stop.gif" height="15" type="image" width="19"><input disabled="disabled" id="btnNext" value=" Next >> " src="http://www.channelnewsasia.com/images/butt_next.gif" height="15" type="image" width="18">

<tbody>
</tbody>
dotline_240.gif

Passengers waiting to board an MRT train. (Photo by: Hester Tan, channelnewsasia.com)


<tbody>
</tbody>







<tbody> </tbody>


SINGAPORE: Singaporeans can expect more temporary closures of segments of the rail network on the North-South and East-West lines in the future.

Transport Minister Lui Tuck Yew said the closures are needed for major works, such as the upgrading of train signalling systems and replacement of the network's older parts.

The authorities would have a better idea of when the shut-downs will take place, and for how long, by the year's end, Mr Lui added.

But moving ahead, commuters will have to get used to temporary closures of some MRT stations for upgrading works.

"If we were to do the upgrading (works) using only the hours available to us now, between the revenue service periods (when the trains are not operating), I think every night you may have at most three-and-a-half or so hours ... (that) leaves very, very little time for major upgrading works," Mr Lui said.

Planned closures of train stations for works to be carried out have been done before. In 2010, stations in western Singapore were shut to allow modification works at the Jurong East station to be carried out. This was done over two weekends.

Mr Lui assured commuters that they will be told well in advance about the planned closures, so that they can make alternative travel arrangements.

There will also be alternative travel arrangements for affected MRT stations.

Mr Lui was speaking to residents from the Cheng San-Seletar ward during his visit to the area on Sunday.

At the dialogue with residents, Mr Lui also addressed concerns on the S$1.1 billion government funding to buy buses for SBS Transit and SMRT.

"If you want this enhanced standard but you don't want the government to put in the money, we think that bus fares on average will have to go up by 15 cents and that's quite a lot. Essentially, when we came up with this scheme, the way we were thinking about it is that this is not a subsidy to the operator. It is actually a subsidy to the commuter," said Mr Lui.

On the recent move to raise the age limit for taxi drivers from 73 to 75, Mr Lui said there are no plans to extend it to bus drivers.

That's because they face a demanding schedule which has to be looked at carefully before any changes are made.

Speaking on the Committee of Inquiry looking into the major train disruptions on the North-South Line in December 2011, Mr Lui said he hopes there's a clear conclusion on what caused the breakdowns and also to take lessons from findings in order to improve how such incidents are managed.

- CNA/wm/fa
 

Cestbon

Alfrescian (Inf)
Asset
The commuter will get use to it after few times shut down for upgrading.
After that it will become norm. No one will complaint.
 

groober2011

Alfrescian
Loyal
I have long advocate that this is long overdue and new tracks need to be laid. Many argued that it is impossible and they need the MRT to operate continuously. I rest my case.
 

ZorrorroZ

Alfrescian
Loyal
So now they are going to call MRT breakdowns as "temporary closures for upgrading".... ROTFL.... so don't be surprised as you are travelling on a train, and suddenly it comes to a halt, and you hear the announcement: "The MRT has temporary been closed for upgrading. Please alight and walk on the tracks to the nearest station. Please do not break any windows as you are alighting."
 

Unrepented

Alfrescian
Loyal
Is there anything that they are not tell the public:confused:

Honey coated words or fairy tales also can, those discerning enough can decipher:o
 

johnny333

Alfrescian (Inf)
Asset
Things must be bad for them to consider shutting down the system:eek: It shouldn't comes as a surprise to anyone using the MRT because trains are running at slower speeds with delays.

With cars & parking being so expensive, many must rely on public transport. To make matters worse, those talented PAP bean counters have eliminated bus routes that compete with the MRT routes. If they are going to shut down the MRT system expect many Sporeans to have a very difficult time. I hope they will remember this in the next GE. :mad:
 

zeddy

Alfrescian (Inf)
Asset
Ah Lui would have eggs on his face if there are still train breakdowns after the upgrading works..
 

groober2011

Alfrescian
Loyal
The MRT resembles the PAP Government very closely, slowly breaking up due to age with no improvements made. The temporary makeovers cannot stem the inevitable deterioration. A clean overhaul of the system is required,
 

Unrepented

Alfrescian
Loyal
Already told you breakdowns are unavoidable.

The upgrading at varing degrees will be continous.

It will be a great achievement to have less breakdowns due to such continous upgrading.

What eggs:confused::o:biggrin:

Ah Lui would have eggs on his face if there are still train breakdowns after the upgrading works..
 

Ramseth

Alfrescian (Inf)
Asset
To be fair, LTY is a good transport minister so far. He implemented plans for new lines and stations. How can you expect these to carried out without temporary stoppages and inconveniences during construction? The Saw woman and Raymond Lim were the real culprits who got public transport into such a state.
 

Bigfuck

Alfrescian (Inf)
Asset
True. He inherited problems from corruption and negligence years ago. The actual report if done accurately and released in its entirety will be a death knell for the PAP. Short of a catharsis within the PAP, it could be end game. They have to thread carefully on this one. They were told by fellow Singaporeans on the problems and what to do. These people were removed over overpaid angmoh consultants who know nothing behave has irresponsible people as what consultants represent in their profession and go fucking around every night while laughing at everyone from Singapore.
 

Suzie

Alfrescian
Loyal
To be fair, LTY is a good transport minister so far. He implemented plans for new lines and stations. How can you expect these to carried out without temporary stoppages and inconveniences during construction? The Saw woman and Raymond Lim were the real culprits who got public transport into such a state.

They are now on Various Directorships and
Collectorships .
 

BuiKia

Alfrescian (InfP)
Generous Asset
Why is this called an upgrade? Is there going to be improvement made on the system? If it is just work to make the system more reliable, then it is just maintenance that is way long overdue.
 

hotbot

Alfrescian
Loyal
as i said before, this smrt organisation is just another typical saf. nothing happen, nothing will be done. saw paik hwa as failed as ceo, and she is very irresponsible to have left the organisation just like that, unless she is asked to go! is she...sometimes, i wonder...:rolleyes:
 

Jlokta

Alfrescian (InfP)
Generous Asset
Why is this called an upgrade? Is there going to be improvement made on the system? If it is just work to make the system more reliable, then it is just maintenance that is way long overdue.

upgrade is just a word to mean all the work they have to do to make right all the wrong in the past.

seriously, what the fark went so wrong that the MRT starts breaking down after so many years in service?
 

Cestbon

Alfrescian (Inf)
Asset
Expected every weekend Saturday & Sunday from end of the year. There will be some MRT station closure eg 3~5 station. Also will be fewer train on line when upgrading take place. It will be on going process every weekend. Until all station complete upgrading expected to take 1~2 year. Commuter will KPKB because taking too long up to 2 year. And every weekend crowded due to less train and some station not in operation.
 

BuiKia

Alfrescian (InfP)
Generous Asset
The taxi driver will be happier during this period and later the company will report huge increase in the driver's income ater the fare hike.


Expected every weekend Saturday & Sunday from end of the year. There will be some MRT station closure eg 3~5 station. Also will be fewer train on line when upgrading take place. It will be on going process every weekend. Until all station complete upgrading expected to take 1~2 year. Commuter will KPKB because taking too long up to 2 year. And every weekend crowded due to less train and some station not in operation.
 
Last edited:
Top