• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Lta demolishes brand new bike path the day after it is completed to build bus stop

makapaaa

Alfrescian (Inf)
Asset
[h=1]LTA DEMOLISHES BRAND NEW BIKE PATH THE DAY AFTER IT IS COMPLETED TO BUILD BUS STOP[/h]
Post date:
19 Jan 2015 - 10:57pm








Residents in Yishun were confused when they found out that a brand new bicycle path in front of NorthPoint Shopping mall was demolished literally the day after it was completed.

One resident, Mr Edward Lim Yew Sih, wrote in to ST forums about his observations back in December and his letter was published on Dec 31[SUP]st[/SUP].

Mr Lim explained that he was a cycling enthusiast and so he had been happy to hear of a new bike path and had been following its development.

He explained that residents were forced to make detours for about 3 to 4 months at the section of road in front of North Point for the construction works but were pleased to see that the works were completed a few weeks early and the barricades came down in December.

Mr Lim explained that his excitement was short-lived as the very next day, new barricades were put up and the newly completed bicycle path was demolished again to make way for a bus stop.

Both these issues should be under LTA as they are transport issues and yet Mr Lim pointed out that resources were wasted due to the lack of coordination.

IT seems that LTA’s lack of coordination runs even deeper than this too as it took them about three weeks to even be able to respond to Mr Lim’s letter.

In response, LTA admitted that they have a lack of coordination and this had resulted in a waste of resources and time:






We thank Mr Edward Lim Yew Sih for his feedback (“New bicycle path demolished before being open to public”; Forum Online, Dec 31).

We admit to an error in coordination on our part.

The Land Transport Authority works to coordinate infrastructure works in an estate to minimise disruption to residents. This is very important as we are in the midst of a substantial expansion of many commuter, pedestrian and cycling initiatives.

In the case of the stretch of new cycling path along Yishun Central, we should have ensured more effective coordination internally, to have identified early the eventual necessity for a new bus stop at the same stretch.

This is an isolated incident. Nevertheless, we have used it as an example to further improve coordination between different projects to prevent inconvenience and disruption.
Helen Lim (Ms)

Director, Media Relations
Land Transport Authority

LTA also justified its incompetence saying that it is currently doing many “sizable” expansion projects and coordination is difficult.

“We should have better internal coordination for this new bicycle path along Yishun Central, to discover earlier the need of a new bus-stop along the same stretch of road,” it said.
LTA also insisted that this was an “isolated incident”.
 

halsey02

Alfrescian (Inf)
Asset
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

Who did Edward Lim, believed in & voted for...go his MP
 

Victory2016

Alfrescian
Loyal
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

Did anyone make money from the development contracts ?

Someone with connections?
 

tonychat

Alfrescian (InfP)
Generous Asset
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

PAP incompetence... Period
 

Confuseous

Alfrescian (Inf)
Asset
New bicycle lane demolished upon completion by LTA

A newly built bicycle lane at Yishun was demolished the day after its construction was completed.

Residents are bemused that the reason is to make way for a new bus-stop. LTA explained that there is a problem with its coordination and will strive for improvement.

Lim Yew Sih, a 51-year-old IT professional, wrote to ST Forum on 31 December 2014 to complain that a newly completed bicycle path along Yishun Central opposite Northpoint Shopping Centre was demolished even before the public could use it.

Interviewed by the media, Mr Lim said that for the past 3 to 4 months, a bicycle path was being built along that stretch of the road, and residents passing by were required to make a detour.

He is a cycling enthusiast and welcomed an earlier announcement by LTA for a network of bicycle paths being built within Yishun Town. This network is supposed to be ready by January 2015. Mr Lim was anticipating its early completion.

In December, the bicycle path seemed to be completed with the surrounding barricades removed. To his surprise, the next day he saw an excavator demolishing the newly completed bicycle path.

According to his understanding, the authority wanted to demolish the bicycle path to make way for a new bus stop. He estimated the length of the demolished bicycle path to be about 100 metres.

Mr Lim told the media that he is puzzled as to why LTA wasted resources constructing the bicycle path if there was already a plan in place to erect a new bus stop.

He questioned how much resources have been wasted.

Also, this is not the first time Mr Lim has witnessed a lack of coordination in carrying out public works among organisations. Once, someone excavated the road for cable laying and upon completion, the road was resurfaced and tarred. Within the next few days, another group of people excavated the same stretch of road for other infrastructure work.

He hopes that the newly formed Municipal Services Office can improve these situations.

LTA admitted that there was a problem with its coordination. Nonetheless, it was an isolated case, LTA said. The following is LTA’s official reply on ST Forum (17 Jan):
http://www.tremeritus.com/2015/01/19/new-bicycle-lane-demolished-upon-completion-by-lta/
 

laksaboy

Alfrescian (Inf)
Asset
Re: New bicycle lane demolished upon completion by LTA

Hardly surprising. After all, these are the geniuses who had spent a fortune to rename Marina Bay as... Marina Bay. :biggrin:
 

retardface

Alfrescian
Loyal
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

LTA says: isolated event, move on and fuck off.
 

laksaboy

Alfrescian (Inf)
Asset
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

LTA says: isolated event, move on and fuck off.

Yeah, the stadium fuckups were also isolated incidents.

'Isolated incident' = PAP-speak for 'it's not my fault, usually I'm excellent'. :wink:
 

Confuseous

Alfrescian (Inf)
Asset
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

The stage is nearing where we become numb to such reports.
THAT is the end.
 

retardface

Alfrescian
Loyal
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

Yeah, the stadium fuckups were also isolated incidents.

'Isolated incident' = PAP-speak for 'it's not my fault, usually I'm excellent'. :wink:

There will be lots more of these isolated incidents because of the apparent lack of accountability.
 

jw5

Moderator
Moderator
Loyal
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

That is why whenever there is a new project or a new person who appears in SG, a ministar or ministar of state should immediately be assigned to that project or that person. If the project is fucked up or the person fucks up, the office holder is immediately held accountable. :wink:

There will be lots more of these isolated incidents because of the apparent lack of accountability.
 

retardface

Alfrescian
Loyal
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

That is why whenever there is a new project or a new person who appears in SG, a ministar or ministar of state should immediately be assigned to that project or that person. If the project is fucked up or the person fucks up, the office holder is immediately held accountable. :wink:

They will say it is beyond their salary scale.
 

jw5

Moderator
Moderator
Loyal
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

Oh bytheway, for some of them, their salaries should also be clawed back. Forgot to mention this very important point. :biggrin:

They will say it is beyond their salary scale.
 

retardface

Alfrescian
Loyal
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

Oh bytheway, for some of them, their salaries should also be clawed back. Forgot to mention this very important point. :biggrin:

Real tears will be shed then not croc ones.
 

songsongjurong

Alfrescian
Loyal
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

Bike pavement cost is derisory compare to millions paid for useless lighting, hybrid grass turf. And they claimed Dr. Chee misused school fund ,expense for stamp.
 

songsongjurong

Alfrescian
Loyal
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

Manwife blew 500million on micropolis,beat that!
 

johnny333

Alfrescian (Inf)
Asset
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

Anyone remember the fiasco at Suzhou. Must have cost more than 500 million.
 

blessed

Alfrescian
Loyal
Re: Lta demolishes brand new bike path the day after it is completed to build bus sto

Yeah, the stadium fuckups were also isolated incidents.

'Isolated incident' = PAP-speak for 'it's not my fault, usually I'm excellent'. :wink:

Isolated incident is for PAP, if committed by opposition will become major mismanagement issue.
 
Top