- Joined
- Aug 8, 2008
- Messages
- 6,070
- Points
- 83
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-47.jpg" alt="" /></p>
<p>The hydroelectric pumped storage power station in Zagorsk, Moscow region, is the only acting hydroelectric pumped storage power station in Russia.</p>
<p><br />
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-11.jpg" alt="" /></p>
<p>The station deals with two tasks simultaneously: it generates and consumes electric energy. Capacity generated by the station is not large but is in demand due to reversibility of the cycle.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-12.jpg" alt="" /></p>
<p>Thus, an atomic power plant generates a certain amount of energy. In view of load lacking the freed capacity has to be spent somewhere or energy output needs to be decreased. The second variant is not good at all. It usually takes an A-plant 9 months to use a definite amount of fuel. If the capacity is changed, the mentioned term will be decreased to 6 months.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-13.jpg" alt="" /></p>
<p>The station is supplied with 6 hydraulic units.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-14.jpg" alt="" /></p>
<p>Ideally every A-plant must have a hydroelectric pumped storage power station nearby as the latter one consumes free capacity.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-15.jpg" alt="" /></p>
<p>A hydroelectric power station must be located along a river. A water-collecting area is based at the back of the dam where water is taken from at night and is put back in the afternoon. They buy cheap energy to fill the reservoir with water at night. In the afternoon expensive energy is generated and sold out.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-16.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-17.jpg" alt="" /></p>
<p>This way</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-18.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-19.jpg" alt="" /></p>
<p>The station is mainly located underground.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-20.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-21.jpg" alt="" /></p>
<p>The turbine room.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-22.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-23.jpg" alt="" /></p>
<p>Pressure conduits are used to release and eject water.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-24.jpg" alt="" /></p>
<p>On the roof of the turbine room.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-25.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-26.jpg" alt="" /></p>
<p>The territory of the city of Moscow and the Moscow region is too vast and the station shown fails to produce enough energy. That is why the second station is to be built.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-27.jpg" alt="" /></p>
<p>The water intake area is surrounded by a fence. A temporary dam helps in construction of the 2nd station.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-28.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-29.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-30.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-31.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-32.jpg" alt="" /></p>
<p>The pressure tunnel on the right is almost completed.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-33.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-34.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-35.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-36.jpg" alt="" /></p>
<p>The territory of the turbine room is slowly increasing.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-37.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-38.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-39.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-40.jpg" alt="" /></p>
<p>280 people work here.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-41.jpg" alt="" /></p>
<p>Equipment.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-42.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-43.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-44.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-45.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-46.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-47.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-48.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-49.jpg" alt="" /></p>
<p>The hydroelectric pumped storage power station in Zagorsk, Moscow region, is the only acting hydroelectric pumped storage power station in Russia.</p>
<p><br />
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-11.jpg" alt="" /></p>
<p>The station deals with two tasks simultaneously: it generates and consumes electric energy. Capacity generated by the station is not large but is in demand due to reversibility of the cycle.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-12.jpg" alt="" /></p>
<p>Thus, an atomic power plant generates a certain amount of energy. In view of load lacking the freed capacity has to be spent somewhere or energy output needs to be decreased. The second variant is not good at all. It usually takes an A-plant 9 months to use a definite amount of fuel. If the capacity is changed, the mentioned term will be decreased to 6 months.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-13.jpg" alt="" /></p>
<p>The station is supplied with 6 hydraulic units.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-14.jpg" alt="" /></p>
<p>Ideally every A-plant must have a hydroelectric pumped storage power station nearby as the latter one consumes free capacity.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-15.jpg" alt="" /></p>
<p>A hydroelectric power station must be located along a river. A water-collecting area is based at the back of the dam where water is taken from at night and is put back in the afternoon. They buy cheap energy to fill the reservoir with water at night. In the afternoon expensive energy is generated and sold out.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-16.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-17.jpg" alt="" /></p>
<p>This way</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-18.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-19.jpg" alt="" /></p>
<p>The station is mainly located underground.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-20.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-21.jpg" alt="" /></p>
<p>The turbine room.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-22.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-23.jpg" alt="" /></p>
<p>Pressure conduits are used to release and eject water.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-24.jpg" alt="" /></p>
<p>On the roof of the turbine room.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-25.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-26.jpg" alt="" /></p>
<p>The territory of the city of Moscow and the Moscow region is too vast and the station shown fails to produce enough energy. That is why the second station is to be built.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-27.jpg" alt="" /></p>
<p>The water intake area is surrounded by a fence. A temporary dam helps in construction of the 2nd station.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-28.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-29.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-30.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-31.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-32.jpg" alt="" /></p>
<p>The pressure tunnel on the right is almost completed.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-33.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-34.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-35.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-36.jpg" alt="" /></p>
<p>The territory of the turbine room is slowly increasing.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-37.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-38.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-39.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-40.jpg" alt="" /></p>
<p>280 people work here.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-41.jpg" alt="" /></p>
<p>Equipment.</p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-42.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-43.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-44.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-45.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-46.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-47.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-48.jpg" alt="" /></p>
<p><img src="http://media.englishrussia.com/112012/zagorsk/zagorsk004-49.jpg" alt="" /></p>