• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Keppel, Cantonment, Prince Edward Road MRT stations on Circle Line to open on July 12

Tree

Stupidman
Loyal
Joined
Aug 20, 2022
Messages
30,083
Points
113

Keppel, Cantonment, Prince Edward Road MRT stations on Circle Line to open on July 12​


Announced in 2015, the 4km stretch was originally slated to be operational in 2025, but was delayed because of the Covid-19 pandemic.

Models walk down a runway set up along the platform of the upcoming Circle Line Cantonment MRT station during the LASALLE College of the Arts’ graduate fashion show “DE:CENTERING” on May 14.

Ahead of the opening, the public can preview and ride free of charge between the three stations on July 4, from 9.30am to 9pm.



Announced in 2015, the 4km stretch was originally slated to be operational in 2025, but was delayed because of the Covid-19 pandemic.

PHOTO: LTA
avatar-alt
Aqil Hamzah



Published May 14, 2026, 08:17 PM
Updated May 14, 2026, 11:21 PM


SINGAPORE – The three remaining stations that will close the loop between HarbourFront and Marina Bay stations on the Circle Line (CCL) will begin operations on July 12, said Acting Transport Minister Jeffrey Siow.

He made the announcement on the evening of May 14 after a LaSalle College of the Arts graduate fashion show at Cantonment station, one of the three new stops.

The other two new stations are Keppel and Prince Edward Road, and they make up the sixth and final stage of the CCL.

Ahead of the opening, the public can preview and ride free of charge between the three stations on July 4, from 9.30am to 9pm, the Land Transport Authority (LTA) said on May 14.


Mr Siow said the new stretch is undergoing final system tests and integration, and the opening of the stations will bring the CCL Stage 6 project to completion.

ef7f3517dda35219fb1f9a5f5ac1aca29fb4a446767325abf9848bc25afc2235

Minister for Transport Jeffery Siow speaking to the media at Cantonment MRT Station on May 14.

ST PHOTO: JASEL POH

Announced in 2015, the 4km stretch was originally slated to be operational in 2025, but was delayed because of the Covid-19 pandemic.

It was then scheduled to open in the first half of 2026, before the timeline was revised to mid-2026, as tunnel strengthening work on the line needed to be completed before remaining work on the final stage could resume.



ea1b631840aa0506fe38687693e135aed1fefeacad6716a0ab93df0957a74932

With its completion, the line will have 33 stations and span 39km. Twelve of the stations are interchanges.

PHOTO: LTA

The sixth stage of the CCL, which is run by operator SMRT, is expected to shorten travelling times and give commuters alternative routes that bypass the busy City Hall and Raffles Place interchanges.
 
Make no difference to Ramesh. He drives. Never want to be caught alive with disgusting Sinkies on public transport.
 
Great, now we can keep going around in circles.
Now from Harbourfront can go to Bayfront easily for casino players. Win at MBS then take train to RWS to win again :laugh:

Not I say one. My senior serial gambler colleague tell me one.
 
Back
Top