sbfuncle Alfrescian Loyal Joined Jun 13, 2023 Messages 9,831 Points 113 Feb 10, 2025 #2 I think should be bus crash onto safety pole. Crash into safety pole means the bus crash and penetrated into the pole.
I think should be bus crash onto safety pole. Crash into safety pole means the bus crash and penetrated into the pole.
Truthspeak Alfrescian Loyal Joined Mar 3, 2024 Messages 5,398 Points 113 Feb 10, 2025 #3 If bus driver is a vaxtard, you will know why
N NanoSpeed Alfrescian Loyal Joined Apr 14, 2015 Messages 7,508 Points 113 Feb 10, 2025 #4 sbfuncle said: I think should be bus crash onto safety pole. Crash into safety pole means the bus crash and penetrated into the pole. Click to expand... Crash into is correct. Crash onto is coming from above you. It's a bollard. Pole is thin and long.
sbfuncle said: I think should be bus crash onto safety pole. Crash into safety pole means the bus crash and penetrated into the pole. Click to expand... Crash into is correct. Crash onto is coming from above you. It's a bollard. Pole is thin and long.
M myfoot123 Alfrescian (Inf) Asset Joined Aug 6, 2008 Messages 13,573 Points 113 Feb 10, 2025 #5 It is not crash, it is called "in contact" with a pole.
sbfuncle Alfrescian Loyal Joined Jun 13, 2023 Messages 9,831 Points 113 Feb 10, 2025 #6 NanoSpeed said: Crash into is correct. Crash onto is coming from above you. It's a bollard. Pole is thin and long. Click to expand... If a man and a child bang each other. Does it means The man crashed onto the child. Whereas The child crashed into the man?
NanoSpeed said: Crash into is correct. Crash onto is coming from above you. It's a bollard. Pole is thin and long. Click to expand... If a man and a child bang each other. Does it means The man crashed onto the child. Whereas The child crashed into the man?
50000 Alfrescian Loyal Joined Dec 29, 2012 Messages 1,922 Points 83 Feb 10, 2025 #7 what was the specs given for the tender? Who signed off on the acceptance? who was the contractor awarded?
what was the specs given for the tender? Who signed off on the acceptance? who was the contractor awarded?