    Exclamation Fucked up ASS-M-RT says needs 6 months to get their shit together

    SINGAPORE: The new signalling system on the North-South Line (NSL) will take between four and six months to stabilise, the Land Transport Authority (LTA) and SMRT said on Friday (Jul 14).

    But a software update to be installed on Friday night is expected to address glitches, some of which have resulted in multiple train disruptions since full-day tests on the new signalling system started in late May.

    Glitches experienced since include door alignment issues when the track is wet and when trains stop at elevated stations, SMRT said at a media briefing co-chaired by LTA CEO Ngien Hoon Ping.

    SMRT started testing the system on the NSL during off-peak hours in late March, and then on Sundays from Apr 16. It said more than 1,300 tests were performed, and that no major issues were encountered.

    When full-day tests started at the end of May, checks to the signalling system subsequently caused delays during rush hour periods on two consecutive days in June, raising questions as to why such checks were being carried out during the day, including at peak hour.

    SMRT Trains’ CEO Lee Ling Wee told reporters on Friday it is important that the system is checked “rigorously” during passenger service to resolve initial teething problems.

    More at North-South Line signalling system to take up to 6 months to stabilise

  2. #2
    Join Date
    Aug 2008
    Location
    Disneyland
    Posts
    22,163
    My Reputation Points: 2229 / Power: 11

    Default Re: Fucked up ASS-M-RT says needs 6 months to get their shit together

    I can confirm that they are having problems with the NE line.
    On thursday afternoon about 3pm I had to wait about 20 minutes for a train.

  3. #3
    Join Date
    Sep 2013
    Posts
    660
    My Reputation Points: 332 / Power: 0

    Default Re: Fucked up ASS-M-RT says needs 6 months to get their shit together

    ...this bunch of crowns does not know what problem they are facing...whats wrong in enquiring from experts ..eg Japan...shinjuku itself have abt 4millions
    Passengers a day ..n japan hv more trains n lines but they do not hv such issue...just thrown in $100 millions n get advice from expert...im sure we can solve most glitches...Tumasick hv oredi lost US 4billion in UBS...so 100mills is nothing.

  4. #4
    Join Date
    Jul 2008
    Posts
    26,176
    My Reputation Points: 4375 / Power: 11

    Default Re: Fucked up ASS-M-RT says needs 6 months to get their shit together

    i'm out of town for a while but when i'm back in 6.9 months mrt will run great again. please be patient. help is on the way.
    6.9 k's of sinkies: kopi, kaya toast, kueh kueh, kio kway, ktv, kpkb.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Serious PwC Fucks Up Academy Awards Ballot Count! Still Trust Them To Count Money?
    By JohnTan in forum The Courtyard Café
    Replies: 0
    Last Post: 27-02-2017, 11:58 AM
  2. Chit Chat Why America needs Donald Trump to get out of Chapter 11
    By Lohmee in forum The Courtyard Café
    Replies: 0
    Last Post: 22-06-2016, 07:31 AM
  3. New law proposed - need wifes approval to get Viagra
    By Agoraphobic in forum The Courtyard Café
    Replies: 4
    Last Post: 15-02-2016, 07:28 AM
  4. Need advice: How to get rid of rice weevils ?
    By Spiky in forum The Courtyard Café
    Replies: 12
    Last Post: 21-11-2011, 04:36 AM
  5. Goldman sachs say sg economy very fuck up
    By madmansg in forum The Courtyard Café
    Replies: 4
    Last Post: 28-11-2008, 03:37 AM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •