My unit
I think it can only be completed in Apr 2014, and VP in May earliest.
The entire block:
Aluminium windows and glasses are already up:
Being southwest facing, it has about 1 metre throw of sunlight into the master room, but the room remains fairly cool and decently bright with natural sunlight. However intermediate terraces are really quite dim inside :(
![Biggrin :biggrin: :biggrin:](/styles/default/xenforo/smilies/biggrin.png)
The entire block:
![](http://imagizer.imageshack.us/v2/640x480q90/849/hnml.jpg)
Aluminium windows and glasses are already up:
![](http://imagizer.imageshack.us/v2/640x480q90/543/1j32.jpg)
![](http://imagizer.imageshack.us/v2/640x480q90/196/moqe.jpg)
Being southwest facing, it has about 1 metre throw of sunlight into the master room, but the room remains fairly cool and decently bright with natural sunlight. However intermediate terraces are really quite dim inside :(
![](http://imagizer.imageshack.us/v2/640x480q90/163/oqdl.jpg)