• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

What’s happening with the High Speed Rail project?

makapaaa

Alfrescian (Inf)
Asset
http://www.tremeritus.com/2015/08/23/whats-happening-with-the-high-speed-rail-project/

[h=2]What’s happening with the High Speed Rail project?[/h]

dmca_protected_sml_120n.png
PostDateIcon.png

August 23rd, 2015 |
PostAuthorIcon.png

Author: Contributions



HSR, nothing happening?

Am sorry to be the bearer of bad news, but for those awaiting the start of
high-speed train (HSR) travel between Spore and KL; the wait is going to be very
long indeed.

Lets look at issues one-by-one:

(A) Welcome to Malaysia?

Firstly, I pondered over the question: Are we welcome to visit Malaysia?

When I look at the daily jam at Tuas and Causeway (crossing), it is hard to
understand that we are welcome.

causeway_jam.jpg
Any
evening, guaranteed a 1 hour jam. Friday, Saturday, evenings it jumps to 2
hours.

And, come a long weekend, its minimum 3 hours each way. Many of you would
have read the report that it took nearly 5 hours to cross during the recent ND
weekend.

And this is an ‘easy’ matter to solve, without spending billions building
another crossing (3[SUP]rd[/SUP] crossing had been talked about).

As a regular crosser, the main problem is lack of personnel. At max, only
50% of the immigration booth will be opened. On the Spore side, there will be
about, 50 booths opened; but then all these converges into 4 lanes (2 on either
side) for customs inspection. And then to compound matters further, eventually
all lanes constricts to a single lane to exit the complex and gets to BKE.

All we need to do is double the number of customs lanes from 2 to 4 (on each
side) and viola, we doubled the speed, and halved the waiting time (without any
comprise on security)

And, of course, we should also send to the Msian immigration, our public
holiday calendar and specifically, mark out the long weekend we have – ok, and
whilst at it, emphasis to them ,that during long weekends, volumes triple, and
will be good to have more immigration officers working during these period.

(B) Rail infrastructure, past and present

The bane of our rail travel problem, is a legacy issue of single , narrow
gauge track.

This problem has been partially solved by KTM, with their “electrification
and double tracking program” that started some 10 years ago. Recently, electric
trains have started service from KL to all the way north to the Thai border town
of Padang Besar, going through major cities like Ipoh and
Penang/Butterworth.

HSR.jpg
To the
south, longtime connection exist till Seremban (recently, extended to Sungai
Buloh). Works is still going on to complete this till Gemas (in Neregi Sembilan,
border of Johor state). But, no works or serious talks to finish the “last
mile” to Johor Baru (no need to extend till Spore, as we will be the rail-head
and existing single track will be fine)

(C) HSR Proposal

This is a strange proposal for the following reasons:-

1. Why would Msia spend billions and not have this HSR pass through two
very important landmarks?

a. KLIA

Surely residents in Melaka, Muar etc would want a
fast connection to KLIA.

Esp since, their current ERL link between KLIA and
Sentral will be very similar in structure to the proposed HSR.

b. Johor Baru

One of their largest state, and HSR will not stop
at their capital city, JB. This would be like our MRT stopping at Chinatown, and
you walk to Raffles Place.

2. Cost

This very important issue has not been addressed
nor talked about since inception. Would Malaysia want to bear 90% of the cost as
majority of the infrastructure is on their land?
Would Spore want to pay
close to 50% of the cost, when we will have no jurisdiction on the rolling
stock?

Do bear in mind, that GB and France signed a
treaty (The Treaty of Canterbury, 1986) before they started construction of
their high speed link between London and Paris .

We are (a short) 5 years away from the proposed
target date of 2020.

3. JCC

So this brings up to a very interesting
development, namely, of the acquisition of Jurong CC in lightning speed. Compare
this with Keppel CC, who were given more than 5 year notice before their land
will be acquired.

And also, the strange move by JCC in suspending
trading of their membership AFTER the announcement. In all normal situations,
trading is suspended Before major/material announcement. After the announcement,
trading resumes as all parties are supposedly in the know – caveat
emptor.


So, what will happen to this land eventually? Condos?

My apologies, for shattering your dreams for a fast and comfortable ride; I
too wanna see this happen, as all major successful cities have their rail
connections as their backbone.


  • London has Euston, Charing Cross, Liverpool St, St Pancras, Paddington,
    Victoria, Waterloo, London Bridge and King’s Cross, as rail head stations.
  • Paris has Gare du Nord, Gare d’Est, Gare d’Lyon.
  • Manhattan, NYC, has Penn and Grand Central (and now WTC)
  • Tokyo has 6 major stations. And their main station, Tokyo Station, has over
    3,000 trains coming in and out daily; with half a million passenger boarding
    each day.
  • Beijing – I don’t know how to count

And just to be cynical, Malaysia has to do (is doing) what is in their best
interest, and they are not in the business of helping
others.

John CB
Chou

Singapore

* Submitted by TRE
reader.


[h=2][/h]
 

laksaboy

Alfrescian (Inf)
Asset
Am sorry to be the bearer of bad news, but for those awaiting the start of high-speed train (HSR) travel between Spore and KL; the wait is going to be very long indeed.

Bad news? This is good news. I don't want a high-speed railway to KL. Only rent-seeking whores, property developers and property agents specializing in Jurong property get orgasmic over that. :rolleyes:
 

syed putra

Alfrescian
Loyal
1) high speed rail will be expensive. A typical regional train can nominally cruise between 160-200 km/hr which should be sufficient between kl-singapore with a lower ticket price.
2) express rail link to klia was initially proposed to be extended to Malacca city and then to Singapore. But operator insist on subsidies of RM1-2billion per year which Dr M at that time rejected. That was way back in 1990's.
3) Malaysia want HSR to have several stops I.e. seremban, Malacca city, muar, Batu pahat and jurong. Singapore wants direct kl-singapore only. That could mean another line built in parallel to HSR line doubling the cost.
4) initially Malaysia discouraged from shopping and traveling or using port facilities in Singapore by Dr m when RM was at par with S$ when he began as PM. In those days, people go shopping in Singapore. Today, I think its the reverse. This could be the real reason why commuter access by trains have been neglected between jb and smrt/KTM. All they need is to allow KTM access to kranji using old KTM line, just slightly further than woodlands and build the immigration there with connection to SMRT. That is cheapest and a quick fix.
 

Leongsam

High Order Twit / Low SES subject
Admin
Asset
Singapore and Malaysia should merge once again so we can do away with all the border controls.
 

quartz28

Alfrescian
Loyal
Najib busy fighting for his life....HSR will be the last thing he bother....this project wait long long and may even up lorry
 
Top